Calico Silver Project
Flagship
A District-Scale Silver System
The Calico Project ("Calico" or the "Project"), comprising the adjacent Waterloo, Langtry and Mule properties, is located in the historic Calico Silver Mining District in the Mojave Desert of San Bernardino County, California.
Under Apollo, the Waterloo and Langtry properties have been combined for the first time. These represent a district-scale mineral system endowment with approximately 6,000 metres (19,680 feet) in mineralized strike length. The Calico Project hosts low-sulfidation epithermal-vein type and disseminated-style silver-barite mineralization, which is open to depth and along strike. Previous operators completed more than 42,000 metres (138,094 feet) of drilling across 438 holes on the Waterloo and Langtry properties.

Drilling hole W22-RC008 at Waterloo, April 2022
Preliminary Economic Assessment
- US$737M
- After-tax NPV5% at US$55/oz silver
- 25%
- After-tax IRR
- US$633M
- Initial capital, including a 25% contingency
- 3 years
- After-tax payback period
Table 1: 2026 Calico Project Preliminary Economic Assessment Metrics
| Key Assumptions | ||
|---|---|---|
| Base Case Silver Price | US$55/oz | |
| Silver Metallurgical Recovery | 65% | |
| Royalty | 2% NSR | |
| Production Profile | units | |
| Total Tonnes Processed | '000 tonnes | 41,981 |
| Total Tonnes Waste | '000 tonnes | 20,517 |
| Stripping Ratio | W:O | 0.49 |
| Ag Grade | g/t | 84.78 |
| Mine Life | years | 15 |
| Mill Feed | '000 tonnes | 41,981 |
| Contained Ag | koz | 114,426 |
| Throughput | tpd | 8,000 |
| Total Ag Recovered | koz | 74,377 |
| Operating Cost | ||
| Open Pit | US$/t moved | 2.57 |
| Processing | US$/t milled | 28.40 |
| G&A - Site Services | US$/t milled | 5.32 |
| Total Unit Operating Cost | US$/t milled | 38.48 |
| Capital Cost | ||
| Initial Capital (including 25% contingency) | US$ '000 | 632,867 |
| Sustaining Capital | US$ '000 | 28,200 |
| Open Pit Backfilling | US$ '000 | 16,619 |
| Closure Costs | US$ '000 | 37,473 |
| Total Capital Cost | US$ '000 | 715,159 |

Figure 1: Calico Project Location and Regional Infrastructure
All dollar figures in United States dollars. Source: news release of October 29, 2026. The effective date of the PEA is October 23, 2026.
2026 Mineral Resource Estimate
Table 3: Summary of the Calico Silver Open Pit Mineral Resources, Effective Date October 1, 2026
| Deposit | Metal | Classification | Cut-off (g/t Ag) | Tonnage (Mt) | Grade (g/t Ag) | Contained Metal (Moz Ag) |
|---|---|---|---|---|---|---|
| Waterloo | Silver | Measured | 34 | 30.6 | 89.5 | 88.2 |
| Indicated | 11.6 | 73.5 | 27.4 | |||
| Measured + Indicated | 42.2 | 85.1 | 115.6 | |||
| Inferred | 1.1 | 65.4 | 2.3 | |||
| Langtry | Inferred | 35 | 23.0 | 66.3 | 49.1 | |
| Total | Measured | 34 | 30.6 | 89.5 | 88.2 | |
| Indicated | 11.6 | 73.5 | 27.4 | |||
| Measured + Indicated | 42.2 | 85.1 | 115.6 | |||
| Inferred | 34 / 35 | 24.2 | 66.3 | 51.5 |
Table 4: Summary of the Waterloo Au Open Pit Mineral Resources, Effective Date October 1, 2026
| Deposit | Classification | Cut-off (g/t Au) | Tonnage (Mt) | Grade (g/t Au) | Contained Metal (Moz Au) |
|---|---|---|---|---|---|
| Waterloo | Inferred | 0.51 | 0.53 | 0.80 | 0.014 |
Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Inferred Mineral Resources have a lower level of geological confidence than Measured and Indicated Mineral Resources. There is no certainty that further exploration will result in their conversion to a higher classification. The Mineral Resource estimate disclosed in this news release was prepared by Ms. Katharine Masun, M.Sc., P.Geo., Principal Resource Geologist with SLR Consulting (Canada) Ltd., a Qualified Person under NI 43-101, who is independent of the Company. The Mineral Resources were classified in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014). Ms. Masun has reviewed and approved the scientific and technical information in this news release relating to the Mineral Resource estimate. Totals may not add or multiply accurately due to rounding. Source: news release of October 29, 2026.
Resource Block Models

Figure 2: Calico Silver Mineral Resources, Change in Tonnage and Average Grade, 2025 to 2026
Earlier Estimates
The 2026 MRE supersedes the June 30, 2025 estimate. The drill hole database is unchanged; differences reflect revised grade capping, estimation and classification methods, updated prices and costs, revised pit constraints, and the change to metal-specific reporting.
Drilling for the Pre-Feasibility Study
A 4,500-metre core drilling program is scheduled to commence by Monday, November 23, 2026 at Calico. The program is designed to gather the engineering, metallurgical and environmental data required for a pre-feasibility study ("PFS") on Calico's existing mineral resource.
- Drilling to commence: Harris Exploration Drilling is scheduled to begin the 32-hole program by November 23, 2026. The program is expected to take approximately three months to complete.
- Permitting is advancing: A critical issues analysis and permitting matrix are complete, and environmental baseline work is under way.
- Permits extended: Temporary Use Permits for the Waterloo and Langtry properties now run to September 28, 2027.
Source: news release of November 17, 2026.

Close to Barstow and Interstate 15
The Calico Project is well-placed relative to infrastructure and is located in the mining-friendly jurisdiction of San Bernardino County, California.
The Calico Project is in the historic Calico Silver Mining District of the Mojave Desert, San Bernardino County, California, about 15 km northeast of Barstow. It is reached year-round from Interstate 15 by paved and dirt roads. The project covers 8,361 acres (3,384 ha) in three adjoining properties (Waterloo - 1,645 acres, Langtry - 1,166 acres, and Mule - 5,550 acres). The majority of the mineral resources at Waterloo and Langtry are located on private lands with county-recognized vested rights to surface mining. Barstow provides workforce, utilities and services, and the Union Pacific main line runs along I-15. Water for the Project is expected to be secured through the acquisition or lease of water rights within the adjudicated Mojave Basin.
Project description from the news release of October 29, 2026.
Other mines of note in the region include SV Minerals Searles Lake Boron project, MP Materials Mountain Pass rare earth element mine and Equinox Gold's Castle Mountain gold mine. Equinox Gold has received acceptance of its project into the United States' FAST-41 program, which is designed to streamline and derisk the permitting process. Rio Tinto's Boron mine is near the border with San Bernardino County, in Kern County.

Land Tenure
Waterloo Property
The Waterloo property comprises 27 fee simple land parcels (1,352 acres) and 21 unpatented claims (19 lode mining, 2 mill site claims) (418 acres).
These were acquired by Apollo through an Asset Purchase Agreement between Stronghold Silver USA Corp., a wholly-owned subsidiary of Apollo and Pan American Minerals Inc. ("Pan American"; a wholly-owned subsidiary of Pan American Silver Corp.), that closed July 13, 2021.
Pan American retains a 2% Net Smelter Royalty on the property.
Langtry Property
The Langtry property comprises 20 patented claims (413 acres) and 38 unpatented lode mining claims (767 acres).
The Project is under option between Stronghold Silver USA Corp., a wholly-owned subsidiary of Apollo, and the Bruce and Elizabeth Strachan Revocable Living Trust for the patented claims, and Athena Minerals Inc. for the unpatented claims.
Mule Property
The Mule property comprises 418 unpatented lode mining claims (5,473 acres)
The Property was acquired by Stronghold Silver USA, from Lithium America Exploration LLC ("Lithium Americas"), a wholly-owned subsidiary of Lithium Americas Corp. Lithium Americas retains a 2% net smelter return royalty on the Mule Property claims.
Tenure descriptions are as stated on Apollo's Calico project page. In December 2025 Apollo announced it secured a 100% interest in the Athena claims at Langtry; see News.
Geology and Mineralization
The Calico District is situated in the Calico Mountains of the Mojave Desert, in the west-central part of the Basin and Range tectonic province. The Calico Mountains consist of a 15 kilometre (9 mile) long northwest-southeast trending range dominantly composed of Tertiary (Miocene) volcanics, volcaniclastics, sedimentary rocks and dacitic intrusions.
The Calico Mountains form an uplifted block in a wedge-shaped zone between three major fault systems: the San Andreas Fault, the Death Valley Fault and the Garlock Fault.
Silver mineralization is associated with mid-Tertiary volcanic activity and northwest-trending fracture zones. Tertiary geologic units in the Calico area are the Pickhandle Formation (volcanic flows, breccias and volcaniclastics primarily of dacitic to andesitic composition) and Barstow Formation (sediments deposited in a shallow lake environment), overlain by the younger (Plio-Pleistocene) Yermo Formation.
Mineralization at Calico occurs as discrete NW and EW striking, high-grade silver-barite veins (primarily hosted in the Pickhandle formation) and broad disseminations and veinlet stockworks (primarily hosted in the Barstow sandstones). Both styles are believed to have formed from a common event, with the host rock controlling the style of mineralization. The timing of mineralization is ~15-20 Ma which aligns with a period of subduction and extension in the region.
Oxide gold mineralization underlies the silver mineralized stratigraphy and was drill defined over 1 km strike length in 2022. The gold mineralisation, which is mainly found at the contact between the Pickhandle and Barstow Formation, remains open in all directions. The continuation of the Calico Fault is present on the Mule property.

Calico property geology, 2021
Technical Reports
History of the Calico District
Silver rich mineralization was discovered in the Calico mountains in 1881 with later extraction focused on high-grade oxidized deposits of vein-related silver. At its height of silver production between 1883 and 1896, Calico had over 50 mines and a population of 1,200 people. Historical estimates of total extracted silver up until 1896 are estimated to be between 15 and 20 Moz (Harthrong, 1983). Most mining of silver ceased in 1896 due a sharp decline in silver prices and an economic depression, with only limited production continuing until the 1930's. One of the major silver producers in the district was the Waterloo silver mine, which is located on the Calico Project.
Barite became a mineral of interest in the region in the 1950's as oil and gas exploration ramped up in the US. There was a concurrent reopening of silver mining, but production remained low. The Leviathon mine near the Langtry property was the largest barite producer on the west coast between 1957-1961. Numerous past-producing mines and historical workings are in the vicinity of the Waterloo and Langtry properties.
More modern exploration commenced on the Waterloo property in 1964, when the American Smelting and Refining Company ("ASARCO") acquired an interest. ASARCO completed a significant amount of technical work including surface sampling, mapping, trenching, drilling and metallurgical testing. They completed an Environmental Impact Assessment report and feasibility in 1980, ultimately receiving a permit to mine. The decline of silver prices at the time resulted in a half of activities and put the project on care and maintenance. Pan American Minerals Inc. (a wholly-owned subsidiary of Pan American Silver Corp.) acquired an initial interest in the project in 1994, acquiring a 100% interest in 1996. Between 2008 and 2012, Pan American completed both reverse circulation and core drilling.
At Langtry, records show the property was acquired by an agent of Superior Oil Corp. ("Superior") in 1966, with discovery of the disseminated silver mineralization occurring around 1967. Exploration by Superior from 1967 to 1984 consisted of geological mapping, geochemical sampling, surface trenching, drilling and metallurgical testing. Superior was subsequently purchased by Mobil Corporation and the Langtry property sat dormant due to depressed silver prices until the Strachan family acquired the private lands in 2004. Athena Minerals Corp. ("Athena") acquired interest in the unpatented claims surrounding the private lands in 2010. A joint venture between Athena and the Strachan family saw a program of surface sampling, trenching and drilling completed by Athena in 2012. A total of 213 drillholes (26,200 metres/86,000 feet) is reported to have been completed on the Langtry Property by the previous operators. Of these, Apollo has audited data for 183 holes, 23,465 m (76,986 ft) which were used for the maiden Calico Project mineral resource estimate.
1881
Silver rich mineralization discovered in the Calico mountains
1883 - 1896
Height of silver production: over 50 mines and a population of 1,200 people
1957 - 1961
The Leviathon mine is the largest barite producer on the west coast
1964
ASARCO acquires an interest in Waterloo
1967
Discovery of disseminated silver mineralization at Langtry
1996
Pan American acquires a 100% interest in Waterloo
July 13, 2021
Apollo's acquisition of Waterloo from Pan American closes



Historical Resource Estimates
These estimates are historical in nature and are not current mineral resources.
Waterloo Historical Resource Estimates
The initial historical resource estimate was calculated by Asarco in 1968, followed by a computer-calculated resource estimate in the late 1970's. Subsequently, Pan American calculated an internal resource based on the results of their 2012 drilling program and validated historical data from Asarco. This work yielded a historical resource estimate of 37.1 million tonnes grading 86 grams/tonne for a total of 103 million ounces of contained silver (refer to Table 1). The reader is cautioned that this resource estimate is historical in nature and the Company is not treating it, or any part of it, as a current mineral resource. Refer to note 1 below.

Note 1: Reference to historic resources at the Waterloo project refer to an internal company document prepared by Pan American., dated 2013, unpublished. Historic resources are reported here as documented in original documents. Abbreviations are grams per metric tonne (g/t) and tonnes are metric. The historical mineral resources discussed here were calculated using mining industry standard practices for estimating Mineral Resource and Mineral Reserves (2005) which was prior to the implementation of the current CIM''s standards for mineral resource estimation (as defined by the CIM Definition Standard on Mineral Resources and Ore Reserves dated May 10, 2014). The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. An independent Qualified Person ('QP') has not completed sufficient work to classify the estimates discussed as current mineral resources or reserves and therefore the estimates should be treated as historical in nature and not current mineral resources or mineral reserves. Apollo's QP, Cathy Fitzgerald, has determined these historic resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the properties. A thorough review of all historic data performed by an independent QP, along with additional exploration work to confirm results, would be required to produce a current mineral resource estimate for either property. Effective February 25, 2019, the U.S. Security and Exchange Commission ('SEC') adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the U.S. Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year beginning on or after January 1, 2021. These replace the disclosure requirements included in SEC Industry Guide 7 and as a result, the SEC now recognizes terms such as "indicated" and "inferred" with respect to mineral resources. U.S. investors are cautioned that while the SEC Modernization Rules are "substantially similar" to the CIM Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Standards.
Langtry Historical Resource Estimates
Exploration on the Langtry Property commenced in 1960 and consisted of several technical programs completed by two companies: Superior Oil Company ("Superior") and Athena Silver Corp. (now Athena Minerals Corp., "Athena"). Exploration by Superior from 1967 to 1984 consisted of geological mapping, geochemical sampling, surface trenching and drilling. Superior was subsequently purchased by Mobil Corporation and the Langtry Project sat dormant due to depressed silver prices until Athena acquired an interest in the Project in 2010. Subsequently Athena completed surface geological mapping, sampling, geotechnical work and drilling. A total of 213 drillholes (26,200 metres/86,000 feet) is reported to have been completed on the Langtry Property by the previous operators. Of these, 20,710 metres (67,946 feet) in 161 drill holes existed in the drill database for the recently released technical report "NI 43-101 Technical Report Langtry Project, California, USA" prepared by H. Samari and L. Breckenridge of Global Resource Engineering, Ltd., with an effective date of December 1, 2021 (see news release of December 2, 2021). Data for the remaining holes has been recently acquired and will be incorporated into the drill database.
An initial historical resource estimate was calculated by Superior in 1970. Subsequently, Athena calculated a resource estimate based on the results of their 2012 drilling program, along with validated historical data from Superior's programs. This independent work was completed by SRK Consulting in 2012 and yielded a historical resource estimate of 12.7 million tons grading 1.48 ounce per tonne for a total of 18.8 million ounces of contained silver in the Indicated category and 30.4 million tons grading 1.40 ounce per tonne for a total of 42.6 million ounces of silver in the Inferred Category as detailed below in Table 2.
The reader is cautioned that this resource estimate is historical in nature and the Company is not treating it, or any part of it, as a current mineral resource. See note 2 below.

Note 2: Reference to historic resources at Langtry refer to Moran et al, 2012, which was an internal report on the Langtry Silver Project, San Bernardino County, California: prepared for Athena Silver Corp, April 2012. [Accessed April 30, 2021]. Historic resources are reported here as documented in original document. Abbreviations are ounces per short ton (opt) and tonnes are imperial. The historical mineral resources discussed here were calculated using mining industry standard practices for estimating Mineral Resource and Mineral Reserves (2005) which was prior to the implementation of the current Canadian Institute of Mining's ('CIM') standards for mineral resource estimation (as defined by the CIM Definition Standard on Mineral Resources and Ore Reserves dated May 10, 2014). The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. An independent Qualified Person ('QP') has not completed sufficient work to classify the estimates discussed as current mineral resources or reserves and therefore the estimates should be treated as historical in nature and not current mineral resources or mineral reserves. Apollo's QP, Cathy Fitzgerald, has determined these historic resources are reliable, and relevant to be included here in that they demonstrate simply the mineral potential of the properties. A thorough review of all historic data performed by an independent QP, along with additional exploration work to confirm results, would be required to produce a current mineral resource estimate for either property.
The scientific and technical data contained in this page was reviewed and approved by Isabelle Lépine, M.Sc., P.Geo., Apollo Silver's Director, Mineral Resources, a Qualified Person as defined by NI 43-101 who is not independent of the Company.